With the Green Max Home we took into account efficiency and comfort ability and that's why the Scheller's decided to have three different zones in the home. This will allow them to control the temperature on all three different levels of the home. Our subcontractors did a EXCELLENT JOB working together sharing all the interior wall stud cavities for all the mechanicals.
I have talked a lot about the sealing of the exterior walls and the building envelope and this is the same for the interior of the home. Dave Jones Heating and Cooling went the extra mile to make sure that all the duct work was sealed with tape and caulk duct sealant. The main purpose for this is to make sure that we do not have energy escaping out of the duct work and that energy is going directly to that register that is calling for heating and cooling.